MENU

News

News

Completion of the construction of the bus stop shed at the north exit of Karuizawa Station and the opening of the temporary enclosure

2015.03.17

The temporary construction fence at the Karuizawa Station North Exit bus stop, which had been in place for a long time, will be completely opened on March 14 (Sat.). Therefore, the circulation bus (4) will move to the bus stop (1). The displacement lane and guardrail will be restored between March 16 (Mon.) and 20 (Fri.) after the temporary fencing is released. In addition, colored pavement for crossing to the No. 5 bus stop and restoration of the flower bed on the north side of the station building will be carried out after the temporary enclosure is released.

201503busstop

Contact us

Karuizawa Town Hall, Living Environment Division, Crime Prevention and Traffic Section
Attn: YANAGISAWA Takayuki, SEKI Katsuyuki
Phone: 0267-45-8556

Pickup Site

Choice