The following areas will be closed to traffic during the night due to the construction of water pipes on the Bambira line of the town road.
When passing through, please follow the guidance staff and information signs to make a detour.
We apologize for any inconvenience caused during this period.
Town road Bambira line water pipe re-installation work
[Period
From May 20, 2021 to the end of June 2021
Regulation time
8:00 p.m. to 5:00 a.m.
[Contractor].
Tsuchiya Equipment Co.
tel 0267-45-7223